Production

Order to shipment in 4–6 weeks

Full-package manufacturing in Bağcılar, İstanbul. The calendar below is our standard; it varies with volume and the client's own season plan.

Rinato production stages, durations and what happens at each
—StageDurationWhat happens
01Order approval1 weekWritten sign-off on price, fabric and delivery calendar.
02Sampling, critics & cutting2 daysPattern revision, critics meeting, marker and cutting.
03Sewing10–15 daysLine set-up, in-line measurement and appearance checks.
04Washing3 daysWashing, drying and finishing to the approved recipe.
05Packing & shipment2 weeks100% final QC, retail-ready packing, export.

Working with your design team

We open a development round every month. Your team sends direction, tech packs or reference garments; ours returns patterns, fabric options and costed samples. Most programmes settle in two rounds because the critics meeting happens with the pattern maker in the room — the pattern is revised while the conversation is still going, not a week after it.

What we hold in-house

Fabric and trim sourcing, style development, the pattern and sample rooms, cutting, sewing and the export desk. Nothing in that chain is brokered out, which is what lets one team answer for a programme from the first fabric option to the shipping document.

Washing and finishing

Washing, drying and finishing are carried out with long-standing partner laundries in İstanbul. Recipes are developed and approved by us, and the wash is tracked against the same restricted substance lists as the rest of the order — the work sits outside our walls, not outside our control.

Rinato's sewing floor at Bağcılar — the cutting tables, the thread racks and the machine line
Plate III — the sewing floor at Bağcılar

Let's develop your own style

Come with a tech pack, a reference garment, or just an idea. Our sample room reaches first cut within 2 days.